BinTrac has prepared an installation reference guide with do's and dont's to ensure correct operation of weighing systems. The report highlights the following areas:-
- A-frame orientation
- Installation clearances in accordance with specified tolerances
- Compliance with recommendations for the auger transporting feed from the bin to the feeding system within the building
- Adequate support of the feed line
The installation guide is available at <www.bintrac.com> under Technical Support.
Click here for the PDF download